Triple
T17389516
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Escanaba River |
E422778
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Boney Falls Hydroelectric Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boney Falls Hydroelectric Plant | Statement: [Escanaba River, hasHydroelectricPlant, Boney Falls Hydroelectric Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Boney Falls Hydroelectric Plant Context triple: [Escanaba River, hasHydroelectricPlant, Boney Falls Hydroelectric Plant]
-
A.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
B.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
C.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
D.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
-
E.
Beaver Dam Hydroelectric Plant
Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Boney Falls Hydroelectric Plant Target entity description: Boney Falls Hydroelectric Plant is a hydroelectric power facility located on Michigan’s Escanaba River, generating electricity by harnessing the river’s flow.
-
A.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
B.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
C.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
D.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
-
E.
Beaver Dam Hydroelectric Plant
Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d710288190bf0f4762801fefae |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43a8c718c81909cb20749aaf12897 |
completed | April 19, 2026, 2:14 a.m. |
Created at: April 10, 2026, 5:45 a.m.