Triple

T17370429
Position Surface form Disambiguated ID Type / Status
Subject Begna E422294 entity
Predicate hasHydropowerPlant P15311 FINISHED
Object Åbjøra hydropower plant NE ONNED1

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Åbjøra hydropower plant | Statement: [Begna, hasHydropowerPlant, Åbjøra hydropower plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Åbjøra hydropower plant
Context triple: [Begna, hasHydropowerPlant, Åbjøra hydropower plant]
  • A. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • B. Åmotfoss power station
    Åmotfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s flow.
  • C. Flørli hydropower station
    Flørli hydropower station is a historic Norwegian power plant in Lysefjord, notable for its dramatic fjordside setting and one of the world’s longest wooden stairways running alongside its penstock.
  • D. Døvikfoss power station
    Døvikfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s waterfall.
  • E. Tonstad Hydropower Station
    Tonstad Hydropower Station is one of Norway’s largest hydroelectric power plants, known for its significant electricity production and role in the country’s renewable energy supply.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Åbjøra hydropower plant
Target entity description: Åbjøra hydropower plant is a hydroelectric facility located on the Begna river in Norway, generating renewable power from the river’s water flow.
  • A. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • B. Åmotfoss power station
    Åmotfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s flow.
  • C. Flørli hydropower station
    Flørli hydropower station is a historic Norwegian power plant in Lysefjord, notable for its dramatic fjordside setting and one of the world’s longest wooden stairways running alongside its penstock.
  • D. Døvikfoss power station
    Døvikfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s waterfall.
  • E. Tonstad Hydropower Station
    Tonstad Hydropower Station is one of Norway’s largest hydroelectric power plants, known for its significant electricity production and role in the country’s renewable energy supply.
  • F. None of above. chosen

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d6535c81908be333c01deaec4e completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43a68ff448190b505861e56df5b6d completed April 19, 2026, 2:14 a.m.
NED1 Entity disambiguation (via context triple) batch_6a019568a27c8190af1bbe6db75f3e6f in_progress May 11, 2026, 8:38 a.m.
Created at: April 10, 2026, 5:44 a.m.