Triple
T17370030
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rjukan |
E422285
|
entity |
| Predicate | hasPowerPlant |
P9904
|
FINISHED |
| Object | Såheim power plant |
—
|
NE ONDG |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Såheim power plant | Statement: [Rjukan, hasPowerPlant, Såheim power plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Såheim power plant Context triple: [Rjukan, hasPowerPlant, Såheim power plant]
-
A.
Forsmo power station
Forsmo power station is a hydroelectric power plant in Sweden that harnesses the flow of the Ångerman River to generate electricity.
-
B.
Montta power plant
Montta power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to regional renewable energy production.
-
C.
Merikoski power plant
Merikoski power plant is a hydroelectric power station located on the Oulujoki River in Oulu, Finland, generating electricity from the river’s flow.
-
D.
Jylhämä power plant
Jylhämä power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to regional electricity production.
-
E.
Pyhäkoski power plant
The Pyhäkoski power plant is a major hydroelectric facility in Finland, known as one of the key stations harnessing the flow of the Oulujoki River for electricity production.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Såheim power plant Triple: [Rjukan, hasPowerPlant, Såheim power plant]
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Såheim power plant Target entity description: Såheim power plant is a historic hydroelectric power station in Rjukan, Norway, built to harness the Rjukan waterfall for industrial development in the early 20th century.
-
A.
Forsmo power station
Forsmo power station is a hydroelectric power plant in Sweden that harnesses the flow of the Ångerman River to generate electricity.
-
B.
Montta power plant
Montta power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to regional renewable energy production.
-
C.
Merikoski power plant
Merikoski power plant is a hydroelectric power station located on the Oulujoki River in Oulu, Finland, generating electricity from the river’s flow.
-
D.
Jylhämä power plant
Jylhämä power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to regional electricity production.
-
E.
Pyhäkoski power plant
The Pyhäkoski power plant is a major hydroelectric facility in Finland, known as one of the key stations harnessing the flow of the Oulujoki River for electricity production.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d6535c81908be333c01deaec4e |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43a6842388190940235198fa50041 |
completed | April 19, 2026, 2:14 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a019566da6c819083b59e0911d02bd5 |
completed | May 11, 2026, 8:37 a.m. |
| NEDg | Description generation | batch_6a01962ae4848190b2aad8e19bf6522f |
in_progress | May 11, 2026, 8:41 a.m. |
Created at: April 10, 2026, 5:44 a.m.