Triple
T17359646
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Koichi Wakata |
E422032
|
entity |
| Predicate | hasCompleted |
P127196
|
FINISHED |
| Object | multiple long-duration space missions |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: multiple long-duration space missions | Statement: [Koichi Wakata, hasCompleted, multiple long-duration space missions]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasCompleted Context triple: [Koichi Wakata, hasCompleted, multiple long-duration space missions]
-
A.
isComplete
Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
-
B.
completedIn
Indicates that an action, process, or task was fully finished within a specified time period or duration.
-
C.
hasNotCompleted
Indicates that an entity has an expected task, process, or requirement that remains unfinished or not yet fulfilled.
-
D.
isCompleteOn
Indicates that an activity, task, or process has been fully finished or achieved by a specific point in time or on a specific date.
-
E.
alsoCompletedBy
Indicates that the same task, activity, or item has been completed by an additional agent or entity besides the one already referenced.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d520008190a26917a95bf1c2ea |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43a4be7448190988593ee342348c1 |
completed | April 19, 2026, 2:13 a.m. |
| PD | Predicate disambiguation | batch_69e3b02662d08190a07d0fb5c04b6f33 |
completed | April 18, 2026, 4:24 p.m. |
| PDg | Predicate description generation | batch_69e3b2a33e8481908fa6ef45290d08aa |
completed | April 18, 2026, 4:34 p.m. |
Created at: April 10, 2026, 5:44 a.m.