Triple

T17331539
Position Surface form Disambiguated ID Type / Status
Subject Projet d’agglomération franco-valdo-genevois E420828 entity
Predicate instanceOf P0 FINISHED
Object metropolitan planning instrument C22869 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metropolitan planning instrument
Context triple: [Projet d’agglomération franco-valdo-genevois, instanceOf, metropolitan planning instrument]
  • A. spatial planning instrument chosen
    A spatial planning instrument is a formal tool, policy, or regulatory mechanism used by authorities to guide, control, and coordinate the use and development of land and space within a defined territory.
  • B. metropolitan authority
    A metropolitan authority is a governing body responsible for planning, coordinating, and managing public services and development across a large urban area and its surrounding municipalities.
  • C. local and regional planning framework
    A local and regional planning framework is a structured set of policies, processes, and tools that guide coordinated land use, infrastructure, and development decisions across municipalities and regions to achieve sustainable, equitable, and efficient growth.
  • D. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • E. urban planning master plan
    An urban planning master plan is a comprehensive, long-term framework that guides the physical, social, and economic development of a city or region through coordinated land use, infrastructure, and policy strategies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d3adc881909319f1edb8d2a956 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:43 a.m.