Triple
T17294662
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Austro-Marxism |
E419874
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Marxist theory current |
C10359
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Marxist theory current Context triple: [Austro-Marxism, instanceOf, Marxist theory current]
-
A.
Marxist tradition
The Marxist tradition is a broad, evolving body of thought and practice rooted in Karl Marx’s critique of capitalism, emphasizing class struggle, historical materialism, and the pursuit of a classless, communist society.
-
B.
revolutionary theory
Revolutionary theory is a conceptual framework that analyzes the conditions, processes, and strategies through which fundamental social, political, or economic transformations occur or can be brought about.
-
C.
current within communism
chosen
The "current within communism" class represents a distinct ideological, theoretical, or practical tendency inside the broader communist movement, defined by its specific interpretations of Marxist principles, strategic priorities, and organizational practices.
-
D.
Socialist
A socialist is an individual who advocates for or supports a socio-economic system in which the means of production, distribution, and exchange are collectively or publicly owned and democratically controlled to promote social and economic equality.
-
E.
branch of socialism
A branch of socialism is a specific ideological or theoretical current within the broader socialist tradition that defines its own principles, goals, and strategies for achieving a more egalitarian and collectively organized society.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886db32608190a61e18862c5a8af6 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:40 a.m.