Triple

T17286301
Position Surface form Disambiguated ID Type / Status
Subject north–south axis of Berlin E419663 entity
Predicate instanceOf P0 FINISHED
Object planned boulevard C6461 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned boulevard
Context triple: [north–south axis of Berlin, instanceOf, planned boulevard]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. civic thoroughfare
    A civic thoroughfare is a major public street or corridor designed to accommodate high volumes of movement while structuring and showcasing key civic, cultural, and institutional functions of a community.
  • C. avenue
    An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
  • D. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • E. urban promenade chosen
    An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886db32608190a61e18862c5a8af6 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.