Triple

T17286255
Position Surface form Disambiguated ID Type / Status
Subject Welthauptstadt Germania plan E419662 entity
Predicate instanceOf P0 FINISHED
Object Nazi architectural project C3624 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi architectural project
Context triple: [Welthauptstadt Germania plan, instanceOf, Nazi architectural project]
  • A. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • B. institution of Nazi Germany
    An institution of Nazi Germany is any formal organization, governmental body, or structured system established or co-opted by the Nazi regime to implement, enforce, or propagate its totalitarian, racist, and expansionist policies between 1933 and 1945.
  • C. Nazi military operation
    A Nazi military operation is a planned and coordinated action conducted by the armed forces of Nazi Germany to achieve specific strategic, tactical, or political objectives during its period of rule, particularly in World War II.
  • D. Stalinist skyscraper
    A Stalinist skyscraper is a monumental high-rise building characterized by grandiose, neoclassical-inspired forms, heavy ornamentation, and a propagandistic expression of Soviet power and ideology.
  • E. component of the Third Reich chosen
    A component of the Third Reich is any organizational, institutional, territorial, or ideological element that contributed to the structure, operation, or objectives of Nazi Germany between 1933 and 1945.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886db32608190a61e18862c5a8af6 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.