Triple

T17286254
Position Surface form Disambiguated ID Type / Status
Subject Welthauptstadt Germania plan E419662 entity
Predicate instanceOf P0 FINISHED
Object architectural vision C33169 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: architectural vision
Context triple: [Welthauptstadt Germania plan, instanceOf, architectural vision]
  • A. architectural design
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • B. architectural development
    Architectural development is the iterative process of designing, refining, and evolving a system’s structure to meet functional, technical, and stakeholder requirements over time.
  • C. visionary architecture project chosen
    A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
  • D. architectural work
    An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
  • E. architectural position
    An architectural position is a conceptual stance or guiding perspective that defines how an architect understands, interprets, and responds to the built environment through design.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886db32608190a61e18862c5a8af6 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.