Triple
T17281687
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Autobahn A5 |
E419543
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object | Autobahn A648 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autobahn A648 | Statement: [Autobahn A5, hasJunctionWith, Autobahn A648]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Autobahn A648 Context triple: [Autobahn A5, hasJunctionWith, Autobahn A648]
-
A.
Autobahn A661
Autobahn A661 is a German federal motorway in the state of Hesse that serves as a key north–south bypass and connector around the Frankfurt am Main metropolitan area.
-
B.
Autobahn A67
Autobahn A67 is a major German motorway in the state of Hesse that serves as an important north–south route connecting the Rhine-Main and Rhine-Neckar metropolitan regions.
-
C.
Autobahn A63
Autobahn A63 is a German federal motorway in Rhineland-Palatinate that connects the Mainz area with Kaiserslautern and links to the wider Autobahn network.
-
D.
Autobahn A61
Autobahn A61 is a major German motorway running roughly north–south in western Germany, serving as an important alternative route to the heavily trafficked Rhine corridor.
-
E.
Autobahn A59
Autobahn A59 is a German federal motorway in North Rhine-Westphalia that runs roughly parallel to the Rhine, connecting cities such as Düsseldorf and Duisburg and serving as an important regional traffic artery.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Autobahn A648 Target entity description: Autobahn A648 is a short German motorway spur that connects the A5 to central Frankfurt am Main and the city’s exhibition grounds.
-
A.
Autobahn A661
Autobahn A661 is a German federal motorway in the state of Hesse that serves as a key north–south bypass and connector around the Frankfurt am Main metropolitan area.
-
B.
Autobahn A67
Autobahn A67 is a major German motorway in the state of Hesse that serves as an important north–south route connecting the Rhine-Main and Rhine-Neckar metropolitan regions.
-
C.
Autobahn A63
Autobahn A63 is a German federal motorway in Rhineland-Palatinate that connects the Mainz area with Kaiserslautern and links to the wider Autobahn network.
-
D.
Autobahn A61
Autobahn A61 is a major German motorway running roughly north–south in western Germany, serving as an important alternative route to the heavily trafficked Rhine corridor.
-
E.
Autobahn A59
Autobahn A59 is a German federal motorway in North Rhine-Westphalia that runs roughly parallel to the Rhine, connecting cities such as Düsseldorf and Duisburg and serving as an important regional traffic artery.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886da626481908a14ce7830329a35 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e4332a4c008190b44f4145d0e94a21 |
completed | April 19, 2026, 1:43 a.m. |
Created at: April 10, 2026, 5:40 a.m.