Triple

T17281685
Position Surface form Disambiguated ID Type / Status
Subject Autobahn A5 E419543 entity
Predicate hasJunctionWith P1018 FINISHED
Object Autobahn A8 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autobahn A8 | Statement: [Autobahn A5, hasJunctionWith, Autobahn A8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Autobahn A8
Context triple: [Autobahn A5, hasJunctionWith, Autobahn A8]
  • A. Autobahn A8 chosen
    Autobahn A8 is a major east–west German motorway that runs across southern Germany, connecting the French border near Saarbrücken to the Austrian border near Salzburg.
  • B. Autobahn A81
    Autobahn A81 is a major German motorway in southwestern Germany that connects Würzburg to the Lake Constance region, serving as an important north–south transport corridor.
  • C. Autobahn A9
    Autobahn A9 is a major German motorway running roughly north–south and connecting Berlin with Munich, serving as one of the country’s key long-distance transport corridors.
  • D. Autobahn A7
    Autobahn A7 is one of Germany’s longest and most important north–south motorways, running from the Danish border through central Germany toward the Austrian border.
  • E. Autobahn A6
    Autobahn A6 is a major German motorway running east–west across southern Germany, connecting the French border near Saarbrücken to the Czech border near Waidhaus and serving several key industrial and urban regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886da626481908a14ce7830329a35 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e4332a4c008190b44f4145d0e94a21 completed April 19, 2026, 1:43 a.m.
Created at: April 10, 2026, 5:40 a.m.