Triple
T17280738
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Punatsangchhu-I Hydroelectric Project |
E419518
|
entity |
| Predicate | supportedBy |
P67
|
FINISHED |
| Object |
Punatsangchhu-I Hydroelectric Project Authority
The Punatsangchhu-I Hydroelectric Project Authority is the organization responsible for overseeing, managing, and implementing the Punatsangchhu-I hydroelectric power project.
|
E1260200
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Punatsangchhu-I Hydroelectric Project Authority | Statement: [Punatsangchhu-I Hydroelectric Project, supportedBy, Punatsangchhu-I Hydroelectric Project Authority]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Punatsangchhu-I Hydroelectric Project Authority Context triple: [Punatsangchhu-I Hydroelectric Project, supportedBy, Punatsangchhu-I Hydroelectric Project Authority]
-
A.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
B.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
-
C.
Loktak Hydroelectric Project
The Loktak Hydroelectric Project is a major hydroelectric power generation facility in Manipur, India, that harnesses the waters of Loktak Lake to supply electricity to the region.
-
D.
Kuri Chhu Hydropower Plant
Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
-
E.
Doyang Hydro Project
Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Punatsangchhu-I Hydroelectric Project Authority Triple: [Punatsangchhu-I Hydroelectric Project, supportedBy, Punatsangchhu-I Hydroelectric Project Authority]
Generated description
The Punatsangchhu-I Hydroelectric Project Authority is the organization responsible for overseeing, managing, and implementing the Punatsangchhu-I hydroelectric power project.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Punatsangchhu-I Hydroelectric Project Authority Target entity description: The Punatsangchhu-I Hydroelectric Project Authority is the organization responsible for overseeing, managing, and implementing the Punatsangchhu-I hydroelectric power project.
-
A.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
B.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
-
C.
Loktak Hydroelectric Project
The Loktak Hydroelectric Project is a major hydroelectric power generation facility in Manipur, India, that harnesses the waters of Loktak Lake to supply electricity to the region.
-
D.
Kuri Chhu Hydropower Plant
Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
-
E.
Doyang Hydro Project
Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886da626481908a14ce7830329a35 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e43329904c8190a4cbc856b9b94ff8 |
completed | April 19, 2026, 1:43 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0179535ae08190ac0137d0f8741919 |
completed | May 11, 2026, 6:38 a.m. |
| NEDg | Description generation | batch_6a0179e161808190b4d865e6e281489c |
completed | May 11, 2026, 6:40 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a017aaf88a48190a85b9a3d7ff30b97 |
completed | May 11, 2026, 6:43 a.m. |
Created at: April 10, 2026, 5:40 a.m.