Triple
T17266216
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Josiah Gorgas |
E419134
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ordnance officer |
C449
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ordnance officer Context triple: [Josiah Gorgas, instanceOf, ordnance officer]
-
A.
quartermaster
A quartermaster is responsible for procuring, managing, and distributing supplies, equipment, and provisions to ensure an organization’s operational readiness.
-
B.
army engineer
An army engineer is a military specialist who designs, constructs, and maintains infrastructure and systems to support combat operations and logistical needs in diverse and often hostile environments.
-
C.
military officer
chosen
A military officer is a formally commissioned leader in the armed forces responsible for planning, directing, and managing operations, personnel, and resources to achieve strategic and tactical objectives.
-
D.
naval officer
A naval officer is a commissioned leader in a navy responsible for commanding personnel and vessels, making strategic and tactical decisions, and ensuring the effective operation and readiness of maritime forces.
-
E.
board officer
A board officer is a high-ranking member of an organization's board of directors, such as a chair, vice-chair, secretary, or treasurer, responsible for leading governance activities and overseeing strategic decision-making.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d9ab108190b70edd8d17aa1204 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:40 a.m.