Triple

T17262694
Position Surface form Disambiguated ID Type / Status
Subject محطة الدار البيضاء الميناء E419045 entity
Predicate instanceOf P0 FINISHED
Object محطة سكك حديدية رئيسية C564 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: محطة سكك حديدية رئيسية
Context triple: [محطة الدار البيضاء الميناء, instanceOf, محطة سكك حديدية رئيسية]
  • A. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • C. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • D. train station chosen
    A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
  • E. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d9ab108190b70edd8d17aa1204 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.