Triple

T17224407
Position Surface form Disambiguated ID Type / Status
Subject Ibi River E418074 entity
Predicate partOf P40 FINISHED
Object Kiso River system E85808 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kiso River system | Statement: [Ibi River, partOf, Kiso River system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kiso River system
Context triple: [Ibi River, partOf, Kiso River system]
  • A. Kamuiwakka River system
    The Kamuiwakka River system is a geothermal-fed river network in Shiretoko, Hokkaido, known for its hot spring waterfalls and rugged natural scenery.
  • B. Fujikawa River system
    The Fujikawa River system is a major river network in central Japan, known for its fast-flowing waters and scenic valleys as it runs through Shizuoka and neighboring prefectures toward Suruga Bay.
  • C. Kiso River chosen
    The Kiso River is a major river in central Japan known for flowing through the Kiso Valley and contributing to the Nōbi Plain’s fertile landscape.
  • D. Iseri River
    The Iseri River is a regional waterway flowing through Kumamoto Prefecture on Japan’s Kyushu island.
  • E. Kizu River
    The Kizu River is a significant river in Japan’s Kansai region that flows through Nara and Kyoto Prefectures before joining the Yodo River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d779488190b131369541c04e7d completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e42ddfe3bc8190b22cee4fc0590b74 completed April 19, 2026, 1:20 a.m.
NED1 Entity disambiguation (via context triple) batch_6a01793cfaf08190bff9a6efe01d5bea completed May 11, 2026, 6:37 a.m.
Created at: April 10, 2026, 5:38 a.m.