Triple

T17216945
Position Surface form Disambiguated ID Type / Status
Subject Basil the Rat E417875 entity
Predicate narrativeResolution P92023 FINISHED
Object hotel narrowly avoids disaster during inspection LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hotel narrowly avoids disaster during inspection | Statement: [Basil the Rat, narrativeResolution, hotel narrowly avoids disaster during inspection]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: narrativeResolution
Context triple: [Basil the Rat, narrativeResolution, hotel narrowly avoids disaster during inspection]
  • A. resolutionInStory chosen
    Indicates the part of a narrative where the central conflicts are resolved and the story’s outcomes are finalized.
  • B. narrativeConsequence
    Indicates that one event, action, or state occurs as a direct result or outcome of another within a narrative sequence.
  • C. narrativePremise
    Indicates the foundational situation, conflict, or setup that initiates and drives the narrative’s events.
  • D. narrative
    Indicates that one entity tells, presents, or conveys a story or sequence of events about another entity or situation.
  • E. narrativeAmbiguity
    Indicates that a narrative contains unclear, open-ended, or multiple possible interpretations of events, motivations, or outcomes.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d779488190b131369541c04e7d completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e42dda6e6c81908dd96f653cd2cba0 completed April 19, 2026, 1:20 a.m.
PD Predicate disambiguation batch_69e3831e354881908c5505ffd15c84e9 completed April 18, 2026, 1:11 p.m.
Created at: April 10, 2026, 5:38 a.m.