Triple

T17196440
Position Surface form Disambiguated ID Type / Status
Subject GE Hitachi Nuclear Energy E417361 entity
Predicate subsidiaryOf P254 FINISHED
Object GE Vernova E83346 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GE Vernova | Statement: [GE Hitachi Nuclear Energy, subsidiaryOf, GE Vernova]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GE Vernova
Context triple: [GE Hitachi Nuclear Energy, subsidiaryOf, GE Vernova]
  • A. GE Vernova chosen
    GE Vernova is General Electric’s energy-focused business, encompassing power generation, grid, and renewable energy technologies and services.
  • B. Enel X
    Enel X is a global energy solutions company specializing in advanced smart grids, electric mobility, and innovative charging technologies for electric vehicles and sustainable transport.
  • C. REpower Systems
    REpower Systems is a German wind turbine manufacturer known for producing large-scale offshore and onshore wind energy solutions.
  • D. GenOn Energy
    GenOn Energy was a major U.S. power generation company that operated a large fleet of fossil-fuel power plants before being absorbed into NRG Energy.
  • E. EDF Renewables
    EDF Renewables is a global renewable energy company specializing in the development, construction, and operation of wind, solar, and energy storage projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d6ba8c819093215917b3d01689 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e42daab57c819093496cbdc7890f34 completed April 19, 2026, 1:19 a.m.
NED1 Entity disambiguation (via context triple) batch_6a015fd7ef048190b0828ec6ea0e119c completed May 11, 2026, 4:49 a.m.
Created at: April 10, 2026, 5:38 a.m.