Triple

T17196322
Position Surface form Disambiguated ID Type / Status
Subject Fermi 3 E417359 entity
Predicate intendedGridConnection P90839 FINISHED
Object Midwest power grid E670635 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Midwest power grid | Statement: [Fermi 3, intendedGridConnection, Midwest power grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Midwest power grid
Context triple: [Fermi 3, intendedGridConnection, Midwest power grid]
  • A. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • B. Midcontinent Independent System Operator region chosen
    The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
  • C. Mid-Atlantic United States electric grid
    The Mid-Atlantic United States electric grid is a regional power network that transmits and distributes electricity across Mid-Atlantic states, interconnecting with neighboring grids to support reliability and power sharing.
  • D. New England power grid
    The New England power grid is the interconnected high-voltage transmission network that delivers electricity across the six New England states, coordinating generation, transmission, and reliability for the region.
  • E. Eastern Interconnection
    The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: intendedGridConnection
Context triple: [Fermi 3, intendedGridConnection, Midwest power grid]
  • A. hasGridConnection
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • B. interconnectionMethodToOtherGrids
    Indicates the method or mechanism by which one grid is physically or operationally interconnected to other grids.
  • C. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • D. gridConnectionCountry
    Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
  • E. gridConnectionPurpose chosen
    Indicates the intended role or function of a connection to an electrical grid within a system or network.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d6ba8c819093215917b3d01689 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e42daab57c819093496cbdc7890f34 completed April 19, 2026, 1:19 a.m.
NED1 Entity disambiguation (via context triple) batch_6a015fd7ef048190b0828ec6ea0e119c completed May 11, 2026, 4:49 a.m.
PD Predicate disambiguation batch_69e383141ae0819096acd71683637cbc completed April 18, 2026, 1:11 p.m.
Created at: April 10, 2026, 5:38 a.m.