Triple

T17181274
Position Surface form Disambiguated ID Type / Status
Subject Public Opinion Institute E416987 entity
Predicate instanceOf P0 FINISHED
Object survey research institute C38858 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: survey research institute
Context triple: [Public Opinion Institute, instanceOf, survey research institute]
  • A. national survey organization
    A national survey organization is an entity that designs, conducts, analyzes, and disseminates large-scale, methodologically rigorous surveys to measure public opinions, behaviors, and demographics across an entire country.
  • B. panel survey
    A panel survey is a longitudinal study method that repeatedly collects data from the same group of respondents over multiple time points to track changes and trends.
  • C. survey brig
    A survey brig is a small, two-masted sailing vessel equipped and crewed for hydrographic, coastal, and exploratory surveying tasks.
  • D. national survey
    A national survey is a systematic data collection effort conducted across an entire country to gather information about the characteristics, opinions, or behaviors of its population.
  • E. international survey
    An international survey is a systematic data collection effort conducted across multiple countries to gather comparable information on opinions, behaviors, or characteristics of individuals or organizations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d5f34c8190b24564dfaa63f3fb completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:37 a.m.