Triple

T17176983
Position Surface form Disambiguated ID Type / Status
Subject Railway Executive E416885 entity
Predicate instanceOf P0 FINISHED
Object railway management organization C4607 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway management organization
Context triple: [Railway Executive, instanceOf, railway management organization]
  • A. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • B. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • C. national railway company
    A national railway company is a state-owned or state-controlled organization responsible for operating and managing a country's primary passenger and freight rail transport services and infrastructure.
  • D. railway industry body chosen
    A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d5f34c8190b24564dfaa63f3fb completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:37 a.m.