Triple

T17176952
Position Surface form Disambiguated ID Type / Status
Subject Road Transport Executive E416884 entity
Predicate instanceOf P0 FINISHED
Object division of the British Transport Commission C38635 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: division of the British Transport Commission
Context triple: [Road Transport Executive, instanceOf, division of the British Transport Commission]
  • A. region of British Railways
    A region of British Railways is a large administrative and operational division of the national rail network, responsible for managing railway services, infrastructure, and staff within a defined geographic area of Great Britain.
  • B. Inland Transport Committee
    The Inland Transport Committee is a policy-making body that develops and coordinates international regulations, standards, and best practices to promote safe, efficient, and sustainable inland transport systems.
  • C. former British Rail sector
    A former British Rail sector is an organizational division that once managed specific types of rail services or geographic areas within the state-owned British Rail system before its restructuring and privatization.
  • D. British Railways policy document
    A British Railways policy document is an official written directive issued by British Railways that defines rules, procedures, and standards governing its operations, staff conduct, and strategic decisions.
  • E. London Underground precursor
    A London Underground precursor is any early urban rail or transport system, proposal, or technological development that directly influenced or led to the creation of the London Underground.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d5f34c8190b24564dfaa63f3fb completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:37 a.m.