Triple

T1717548
Position Surface form Disambiguated ID Type / Status
Subject Franck Report E37322 entity
Predicate addressedTo P265 FINISHED
Object Interim Committee on nuclear policy
The Interim Committee on nuclear policy was a high-level advisory body established by the U.S. government during World War II to guide decisions on the development and potential use of atomic weapons.
E192866 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interim Committee on nuclear policy | Statement: [Franck Report, addressedTo, Interim Committee on nuclear policy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interim Committee on nuclear policy
Context triple: [Franck Report, addressedTo, Interim Committee on nuclear policy]
  • A. S-1 Uranium Committee
    The S-1 Uranium Committee was a U.S. government scientific advisory group that coordinated early research into nuclear fission and atomic weapons, laying the groundwork for what became the Manhattan Project.
  • B. General Advisory Committee of the U.S. Atomic Energy Commission
    The General Advisory Committee of the U.S. Atomic Energy Commission was a high-level scientific advisory body that counseled the U.S. government on nuclear energy policy, research, and weapons development in the mid-20th century.
  • C. Nuclear Planning Group
    The Nuclear Planning Group is NATO’s senior body responsible for developing and coordinating the Alliance’s nuclear policy and planning among member states.
  • D. Advisory Commission to the Council of National Defense
    The Advisory Commission to the Council of National Defense was a World War I–era U.S. advisory body that coordinated industrial and economic resources for national defense prior to being superseded by later wartime production agencies.
  • E. Baruch Plan for international control of atomic energy
    The Baruch Plan for international control of atomic energy was a 1946 U.S. proposal to place all nuclear activities under international oversight to prevent nuclear weapons proliferation and promote peaceful uses of atomic energy.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interim Committee on nuclear policy
Triple: [Franck Report, addressedTo, Interim Committee on nuclear policy]
Generated description
The Interim Committee on nuclear policy was a high-level advisory body established by the U.S. government during World War II to guide decisions on the development and potential use of atomic weapons.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interim Committee on nuclear policy
Target entity description: The Interim Committee on nuclear policy was a high-level advisory body established by the U.S. government during World War II to guide decisions on the development and potential use of atomic weapons.
  • A. S-1 Uranium Committee
    The S-1 Uranium Committee was a U.S. government scientific advisory group that coordinated early research into nuclear fission and atomic weapons, laying the groundwork for what became the Manhattan Project.
  • B. General Advisory Committee of the U.S. Atomic Energy Commission
    The General Advisory Committee of the U.S. Atomic Energy Commission was a high-level scientific advisory body that counseled the U.S. government on nuclear energy policy, research, and weapons development in the mid-20th century.
  • C. Nuclear Planning Group
    The Nuclear Planning Group is NATO’s senior body responsible for developing and coordinating the Alliance’s nuclear policy and planning among member states.
  • D. Advisory Commission to the Council of National Defense
    The Advisory Commission to the Council of National Defense was a World War I–era U.S. advisory body that coordinated industrial and economic resources for national defense prior to being superseded by later wartime production agencies.
  • E. Baruch Plan for international control of atomic energy
    The Baruch Plan for international control of atomic energy was a 1946 U.S. proposal to place all nuclear activities under international oversight to prevent nuclear weapons proliferation and promote peaceful uses of atomic energy.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861912dc8190931af43b4b9158a7 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa63362ba481909e08e9f6fbf00b37 completed March 6, 2026, 5:16 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad8ae6940c81909c1ebdfb0cdef5fc completed March 8, 2026, 2:42 p.m.
NEDg Description generation batch_69ad957adf1c8190b7c8656c1984f998 completed March 8, 2026, 3:27 p.m.
NED2 Entity disambiguation (via description) batch_69ad97af6b388190b2af293599108df3 completed March 8, 2026, 3:37 p.m.
Created at: March 4, 2026, 7:30 p.m.