Triple

T17173682
Position Surface form Disambiguated ID Type / Status
Subject Project Juno mission to Mir E416802 entity
Predicate instanceOf P0 FINISHED
Object British-Soviet space mission C8801 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British-Soviet space mission
Context triple: [Project Juno mission to Mir, instanceOf, British-Soviet space mission]
  • A. International Space Station expedition
    An International Space Station expedition is a long-duration mission during which a designated crew lives and works aboard the ISS to conduct scientific research, perform maintenance, and support ongoing space operations.
  • B. lunar landing mission
    A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
  • C. space mission chosen
    A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
  • D. cosmonaut
    A cosmonaut is a trained Russian or former Soviet space traveler responsible for operating spacecraft, conducting experiments, and ensuring mission safety in outer space.
  • E. Space Shuttle mission
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d5f34c8190b24564dfaa63f3fb completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:37 a.m.