Triple

T17161298
Position Surface form Disambiguated ID Type / Status
Subject Waikato hydro scheme E416483 entity
Predicate hasDam P8736 FINISHED
Object Atiamuri Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atiamuri Dam | Statement: [Waikato hydro scheme, hasDam, Atiamuri Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atiamuri Dam
Context triple: [Waikato hydro scheme, hasDam, Atiamuri Dam]
  • A. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • B. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • C. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • D. Capanda Dam
    Capanda Dam is a major hydroelectric dam in Angola that generates power and supports regional development along the Kwanza River.
  • E. Rusape Dam
    Rusape Dam is a major reservoir in northeastern Zimbabwe that supplies water for irrigation, domestic use, and recreation to the town of Rusape and surrounding areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Atiamuri Dam
Target entity description: Atiamuri Dam is a hydroelectric dam on New Zealand’s Waikato River that forms part of the country’s major Waikato River power generation scheme.
  • A. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • B. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • C. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • D. Capanda Dam
    Capanda Dam is a major hydroelectric dam in Angola that generates power and supports regional development along the Kwanza River.
  • E. Rusape Dam
    Rusape Dam is a major reservoir in northeastern Zimbabwe that supplies water for irrigation, domestic use, and recreation to the town of Rusape and surrounding areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d279c081909f8ff1f743ddeb69 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3f91258648190a40396067ba5ecd3 completed April 18, 2026, 9:35 p.m.
Created at: April 10, 2026, 5:37 a.m.