Triple
T17161206
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arapuni Power Station |
E416481
|
entity |
| Predicate | wasNewZealandFirstLargeHydroOnWaikato |
P126343
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Arapuni Power Station, wasNewZealandFirstLargeHydroOnWaikato, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: wasNewZealandFirstLargeHydroOnWaikato Context triple: [Arapuni Power Station, wasNewZealandFirstLargeHydroOnWaikato, true]
-
A.
hydroelectricStationCommissioned
Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
-
B.
expectedToBeLargestHydroelectricSourceIn
Indicates that something is anticipated to become the primary or largest source of hydroelectric power within a specified region or location.
-
C.
hasHydroelectricProject
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
D.
isHydroelectricProjectOn
Indicates that a hydroelectric project is located on or situated along a specified water body or site.
-
E.
hasHydroelectricDevelopments
Indicates that one entity possesses, contains, or is associated with hydroelectric power generation installations or projects.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d279c081909f8ff1f743ddeb69 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3f91258648190a40396067ba5ecd3 |
completed | April 18, 2026, 9:35 p.m. |
| PD | Predicate disambiguation | batch_69e3830d2a90819092386717dc56f0e8 |
completed | April 18, 2026, 1:11 p.m. |
| PDg | Predicate description generation | batch_69e3873f62108190966c4e741ebd548d |
completed | April 18, 2026, 1:29 p.m. |
Created at: April 10, 2026, 5:37 a.m.