Triple

T171475
Position Surface form Disambiguated ID Type / Status
Subject Conley Terminal E3131 entity
Predicate instanceOf P0 FINISHED
Object marine cargo facility C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: marine cargo facility
Context triple: [Conley Terminal, instanceOf, marine cargo facility]
  • A. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • C. waterfront district
    A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
  • D. diplomatic facility
    A diplomatic facility is a building or complex used by a nation or international organization to conduct official diplomatic activities, house diplomatic staff, and provide consular services in a host country.
  • E. airlift
    Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2524ce1e48190ab066bf72859f474 completed Feb. 28, 2026, 2:26 a.m.
Created at: Feb. 28, 2026, 2:34 a.m.