Triple

T17142180
Position Surface form Disambiguated ID Type / Status
Subject Brisbane River catchment E415994 entity
Predicate contains P35 FINISHED
Object Somerset Dam E1109416 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Somerset Dam | Statement: [Brisbane River catchment, contains, Somerset Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Somerset Dam
Context triple: [Brisbane River catchment, contains, Somerset Dam]
  • A. Somerset Dam
    Somerset Dam is a hydroelectric and flood-control structure located on the Deerfield River in the northeastern United States.
  • B. Somerset Dam chosen
    Somerset Dam is a rural town in Queensland, Australia, known for its proximity to the Somerset Dam reservoir and its role as a recreational and water-supply area.
  • C. Yates Dam
    Yates Dam is a hydroelectric dam located on the Tallapoosa River in Alabama, used primarily for power generation and water management.
  • D. Moondarra Dam
    Moondarra Dam is a major water storage and irrigation structure in Queensland, Australia, built to supply water to the nearby city of Mount Isa and its mining operations.
  • E. Roxburgh Dam
    Roxburgh Dam is a major hydroelectric power station in New Zealand’s South Island, known for harnessing the Clutha River / Mata-Au to generate electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d15af4819092f92f8a129763e6 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3f2d5de10819090cbd65661b018d3 completed April 18, 2026, 9:08 p.m.
NED1 Entity disambiguation (via context triple) batch_6a01483158348190abb96b36caaf455a completed May 11, 2026, 3:08 a.m.
Created at: April 10, 2026, 5:36 a.m.