Triple
T17142180
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brisbane River catchment |
E415994
|
entity |
| Predicate | contains |
P35
|
FINISHED |
| Object | Somerset Dam |
E1109416
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Somerset Dam | Statement: [Brisbane River catchment, contains, Somerset Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Somerset Dam Context triple: [Brisbane River catchment, contains, Somerset Dam]
-
A.
Somerset Dam
Somerset Dam is a hydroelectric and flood-control structure located on the Deerfield River in the northeastern United States.
-
B.
Somerset Dam
chosen
Somerset Dam is a rural town in Queensland, Australia, known for its proximity to the Somerset Dam reservoir and its role as a recreational and water-supply area.
-
C.
Yates Dam
Yates Dam is a hydroelectric dam located on the Tallapoosa River in Alabama, used primarily for power generation and water management.
-
D.
Moondarra Dam
Moondarra Dam is a major water storage and irrigation structure in Queensland, Australia, built to supply water to the nearby city of Mount Isa and its mining operations.
-
E.
Roxburgh Dam
Roxburgh Dam is a major hydroelectric power station in New Zealand’s South Island, known for harnessing the Clutha River / Mata-Au to generate electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d15af4819092f92f8a129763e6 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3f2d5de10819090cbd65661b018d3 |
completed | April 18, 2026, 9:08 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a01483158348190abb96b36caaf455a |
completed | May 11, 2026, 3:08 a.m. |
Created at: April 10, 2026, 5:36 a.m.