Triple

T17141811
Position Surface form Disambiguated ID Type / Status
Subject Pulqui II E415982 entity
Predicate developmentEndDate P73439 FINISHED
Object 1950s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1950s | Statement: [Pulqui II, developmentEndDate, 1950s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: developmentEndDate
Context triple: [Pulqui II, developmentEndDate, 1950s]
  • A. developmentDate
    Indicates the date on which something was created, developed, or brought into existence.
  • B. developmentEnded chosen
    Indicates that the process of creating, improving, or expanding something has been completed and no further development is taking place.
  • C. developedAt
    Indicates the place or location where something was created, built, or developed.
  • D. initialProductionEndDate
    Indicates the date on which the initial phase or run of production for something comes to an end.
  • E. dateImplemented
    Indicates the date on which something (such as a plan, rule, feature, or system) was put into effect or made operational.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d15af4819092f92f8a129763e6 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3f2d5de10819090cbd65661b018d3 completed April 18, 2026, 9:08 p.m.
PD Predicate disambiguation batch_69e3830192ac819091344a9e5a36c8c9 completed April 18, 2026, 1:11 p.m.
Created at: April 10, 2026, 5:36 a.m.