Triple

T17114812
Position Surface form Disambiguated ID Type / Status
Subject WAZA Conservation Strategy E415312 entity
Predicate instanceOf P0 FINISHED
Object guidance framework for zoos and aquariums C38549 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: guidance framework for zoos and aquariums
Context triple: [WAZA Conservation Strategy, instanceOf, guidance framework for zoos and aquariums]
  • A. zoological society
    A zoological society is an organization dedicated to the study, conservation, and public education of animals and their habitats, often managing zoos, wildlife programs, and research initiatives.
  • B. zoological code
    A zoological code is a formal system of rules and conventions that governs the scientific naming, classification, and nomenclatural validity of animal species.
  • C. zoo
    A zoo is a facility where a variety of live animals are kept, cared for, and displayed to the public for education, conservation, and recreation.
  • D. zoological museum
    A zoological museum is a public institution that collects, preserves, researches, and exhibits animal specimens and related materials to educate visitors about zoology, biodiversity, and the natural world.
  • E. oceanarium
    An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d090cc8190a39cb94992586905 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:35 a.m.