Triple
T17109242
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Krasnoye Sormovo Factory |
E415181
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shipbuilding plant |
C13842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shipbuilding plant Context triple: [Krasnoye Sormovo Factory, instanceOf, shipbuilding plant]
-
A.
shipbuilding facility
chosen
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
B.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
C.
shipbuilding firm
A shipbuilding firm is a company that designs, constructs, and sometimes repairs ships and other marine vessels for commercial, military, or private use.
-
D.
naval shipbuilding program
A naval shipbuilding program is an organized, long-term initiative to design, construct, and deliver warships and support vessels to meet a navy’s strategic, operational, and technological requirements.
-
E.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d090cc8190a39cb94992586905 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:35 a.m.