Triple
T17098222
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Xiong’an railway station |
E414904
|
entity |
| Predicate | servedByLine |
P1293
|
FINISHED |
| Object |
Xiong’an–Shangqiu high-speed railway
The Xiong’an–Shangqiu high-speed railway is a major Chinese high-speed rail corridor designed to connect the Xiong’an New Area in Hebei with Shangqiu in Henan, enhancing regional integration and rapid passenger transport across northern and central China.
|
E1253162
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Xiong’an–Shangqiu high-speed railway | Statement: [Xiong’an railway station, servedByLine, Xiong’an–Shangqiu high-speed railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Xiong’an–Shangqiu high-speed railway Context triple: [Xiong’an railway station, servedByLine, Xiong’an–Shangqiu high-speed railway]
-
A.
Zhengzhou–Xi’an High-Speed Railway
The Zhengzhou–Xi’an High-Speed Railway is a major high-speed rail corridor in central China linking the cities of Zhengzhou and Xi’an as part of the country’s broader high-speed rail network.
-
B.
Xuzhou–Lanzhou High-Speed Railway
The Xuzhou–Lanzhou High-Speed Railway is a major east–west high-speed rail corridor in China that links eastern and northwestern regions, significantly reducing travel times and enhancing regional connectivity.
-
C.
Shijiazhuang–Taiyuan High-Speed Railway
The Shijiazhuang–Taiyuan High-Speed Railway is a major Chinese high-speed rail line linking Hebei’s capital Shijiazhuang with Shanxi’s capital Taiyuan, significantly shortening travel times across the Taihang Mountains and integrating Shanxi into the national high-speed rail network.
-
D.
Beijing–Xiong’an intercity railway
The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
-
E.
Qingdao–Taiyuan High-Speed Railway
The Qingdao–Taiyuan High-Speed Railway is a major high-speed rail corridor in northern China that connects the coastal city of Qingdao with the inland provincial capital Taiyuan, significantly reducing travel times across Shandong and Shanxi provinces.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Xiong’an–Shangqiu high-speed railway Triple: [Xiong’an railway station, servedByLine, Xiong’an–Shangqiu high-speed railway]
Generated description
The Xiong’an–Shangqiu high-speed railway is a major Chinese high-speed rail corridor designed to connect the Xiong’an New Area in Hebei with Shangqiu in Henan, enhancing regional integration and rapid passenger transport across northern and central China.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Xiong’an–Shangqiu high-speed railway Target entity description: The Xiong’an–Shangqiu high-speed railway is a major Chinese high-speed rail corridor designed to connect the Xiong’an New Area in Hebei with Shangqiu in Henan, enhancing regional integration and rapid passenger transport across northern and central China.
-
A.
Zhengzhou–Xi’an High-Speed Railway
The Zhengzhou–Xi’an High-Speed Railway is a major high-speed rail corridor in central China linking the cities of Zhengzhou and Xi’an as part of the country’s broader high-speed rail network.
-
B.
Xuzhou–Lanzhou High-Speed Railway
The Xuzhou–Lanzhou High-Speed Railway is a major east–west high-speed rail corridor in China that links eastern and northwestern regions, significantly reducing travel times and enhancing regional connectivity.
-
C.
Shijiazhuang–Taiyuan High-Speed Railway
The Shijiazhuang–Taiyuan High-Speed Railway is a major Chinese high-speed rail line linking Hebei’s capital Shijiazhuang with Shanxi’s capital Taiyuan, significantly shortening travel times across the Taihang Mountains and integrating Shanxi into the national high-speed rail network.
-
D.
Beijing–Xiong’an intercity railway
The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
-
E.
Qingdao–Taiyuan High-Speed Railway
The Qingdao–Taiyuan High-Speed Railway is a major high-speed rail corridor in northern China that connects the coastal city of Qingdao with the inland provincial capital Taiyuan, significantly reducing travel times across Shandong and Shanxi provinces.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886cfc8e88190b05ba466edd35591 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3dbffafb08190baf9e0b4fdf1b404 |
completed | April 18, 2026, 7:31 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0141422d6c819086dc98988c0851d9 |
completed | May 11, 2026, 2:38 a.m. |
| NEDg | Description generation | batch_6a01437dd094819093603356fa2c2582 |
completed | May 11, 2026, 2:48 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a014416c6a08190aeca937990d2b5a2 |
completed | May 11, 2026, 2:51 a.m. |
Created at: April 10, 2026, 5:35 a.m.