Triple

T17087267
Position Surface form Disambiguated ID Type / Status
Subject Caroní River E414630 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Caruachi Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Caruachi Dam | Statement: [Caroní River, hasHydroelectricPlant, Caruachi Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Caruachi Dam
Context triple: [Caroní River, hasHydroelectricPlant, Caruachi Dam]
  • A. Caruachi Dam chosen
    Caruachi Dam is a large hydroelectric dam on the Caroní River in Venezuela that forms part of the Guri–Macagua–Caruachi power complex supplying a significant share of the country’s electricity.
  • B. Cornalvo Dam
    Cornalvo Dam is an ancient Roman gravity dam in Spain, renowned for its well-preserved engineering and role in supplying water to the city of Mérida.
  • C. El Chocón Dam
    El Chocón Dam is a large hydroelectric dam in Argentina known for its significant role in power generation and flood control on the Limay River.
  • D. San Carlos Dam
    San Carlos Dam is a major concrete gravity dam in Arizona that creates San Carlos Lake and provides irrigation water, flood control, and hydroelectric power along the Gila River.
  • E. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cef44c8190ba56c44b4e863e64 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3dbe7ccb48190b8fb39e2a0ba0782 completed April 18, 2026, 7:30 p.m.
Created at: April 10, 2026, 5:35 a.m.