Triple

T17087266
Position Surface form Disambiguated ID Type / Status
Subject Caroní River E414630 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Macagua Dam NE ONNED1

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Macagua Dam | Statement: [Caroní River, hasHydroelectricPlant, Macagua Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Macagua Dam
Context triple: [Caroní River, hasHydroelectricPlant, Macagua Dam]
  • A. Macagua Dam chosen
    Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
  • B. Tavera Dam
    Tavera Dam is a major hydroelectric and water-supply dam in the Dominican Republic, crucial for power generation, irrigation, and flood control in the Yaque del Norte River basin.
  • C. San Vicente Dam
    San Vicente Dam is a major concrete gravity dam in San Diego County, California, that forms San Vicente Reservoir and plays a key role in the region’s water supply and storage.
  • D. Malpaso Dam
    Malpaso Dam is a major hydroelectric dam in Chiapas, Mexico, forming one of the country’s largest reservoirs and playing a key role in national power generation and flood control.
  • E. Bayano Dam
    Bayano Dam is a major hydroelectric dam in Panama that impounds the Bayano River to form Bayano Lake and supply power to the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cef44c8190ba56c44b4e863e64 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3dbe7ccb48190b8fb39e2a0ba0782 completed April 18, 2026, 7:30 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0195428c6c8190a11e3f7c8f6796fe in_progress May 11, 2026, 8:37 a.m.
Created at: April 10, 2026, 5:35 a.m.