Triple

T1708351
Position Surface form Disambiguated ID Type / Status
Subject Interstate 205 E36922 entity
Predicate instanceOf P0 FINISHED
Object bypass highway C3122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bypass highway
Context triple: [Interstate 205, instanceOf, bypass highway]
  • A. highway chosen
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • B. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • C. highway approach route
    A highway approach route is a roadway segment or path that guides vehicles from local or arterial roads onto a highway, facilitating safe and efficient merging into higher-speed traffic.
  • D. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • E. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88617439c819094ffb5d16a0f6307 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:30 p.m.