Triple
T17061314
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pantabangan |
E413965
|
entity |
| Predicate | hasNotableStructure |
P105
|
FINISHED |
| Object | Pantabangan Dam |
E418015
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pantabangan Dam | Statement: [Pantabangan, hasNotableStructure, Pantabangan Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pantabangan Dam Context triple: [Pantabangan, hasNotableStructure, Pantabangan Dam]
-
A.
Pantabangan Dam
chosen
Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
-
B.
Nangbeto Dam
Nangbeto Dam is a hydroelectric and irrigation dam on the Mono River in West Africa, jointly developed by Togo and Benin to generate power and support regional water management.
-
C.
Saguling Dam
Saguling Dam is a major hydroelectric and multipurpose dam in West Java, Indonesia, forming one of the key reservoirs on the Citarum River.
-
D.
Pracana Dam
Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
-
E.
Bayano Dam
Bayano Dam is a major hydroelectric dam in Panama that impounds the Bayano River to form Bayano Lake and supply power to the country.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886cde3d481908d4d01ba88ba7eb7 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3db7dea7481909e3e0bc836d27336 |
completed | April 18, 2026, 7:29 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a01234be4e4819084701902e7bd3a27 |
completed | May 11, 2026, 12:31 a.m. |
Created at: April 10, 2026, 5:34 a.m.