Triple

T17059921
Position Surface form Disambiguated ID Type / Status
Subject Liban Quarry E413928 entity
Predicate instanceOf P0 FINISHED
Object former limestone quarry C13502 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former limestone quarry
Context triple: [Liban Quarry, instanceOf, former limestone quarry]
  • A. former quarry chosen
    A former quarry is a previously excavated open-pit site where stone, minerals, or other materials were extracted, now typically abandoned, repurposed, or undergoing natural or managed reclamation.
  • B. limestone quarry complex
    A limestone quarry complex is an integrated industrial site where limestone is extracted, processed, and sometimes refined or transported, typically including open pits, crushing facilities, storage areas, and supporting infrastructure.
  • C. former gravel pit
    A former gravel pit is a previously excavated site where gravel was extracted, now typically abandoned, reclaimed, or repurposed for new land uses such as recreation, habitat restoration, or development.
  • D. sandstone quarry
    A sandstone quarry is an open-pit excavation site where sandstone rock is extracted from the earth for use in construction, architecture, and industrial applications.
  • E. fossil quarry
    A fossil quarry is a designated excavation site where paleontologists systematically uncover, extract, and study preserved remains or traces of ancient organisms embedded in rock layers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cde3d481908d4d01ba88ba7eb7 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:34 a.m.