Triple

T17055391
Position Surface form Disambiguated ID Type / Status
Subject March Field (planned) E413806 entity
Predicate instanceOf P0 FINISHED
Object planned parade ground C38718 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned parade ground
Context triple: [March Field (planned), instanceOf, planned parade ground]
  • A. military parade
    A military parade is a formal, organized procession of armed forces showcasing personnel, equipment, discipline, and national power, often held for ceremonial or commemorative purposes.
  • B. parade event
    A parade event is a planned public procession featuring organized groups, performances, and displays moving along a designated route for celebration, commemoration, or entertainment.
  • C. ceremonial precinct
    A ceremonial precinct is a designated, often architecturally distinct area within a settlement or sacred landscape reserved for ritual, religious, or state ceremonial activities.
  • D. parade
    A parade is a coordinated public procession of people, vehicles, or floats moving along a designated route, typically held to celebrate, commemorate, or promote a particular event, cause, or group.
  • E. planned national memorial
    A planned national memorial is a formally proposed and authorized monument or site, not yet completed, intended to commemorate a person, group, event, or idea of enduring national significance.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cde3d481908d4d01ba88ba7eb7 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:34 a.m.