Triple

T17045861
Position Surface form Disambiguated ID Type / Status
Subject STS-122 E413565 entity
Predicate precededBy P97 FINISHED
Object STS-120 E117961 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-120 | Statement: [STS-122, precededBy, STS-120]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-120
Context triple: [STS-122, precededBy, STS-120]
  • A. STS-120 chosen
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • B. STS-122
    STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
  • C. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • D. STS-128
    STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
  • E. STS-123
    STS-123 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2008 that delivered key components including Japan’s Kibo logistics module and the Canadian-built Dextre robotic system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cd18288190b006abab23f811b7 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3da9d7e988190a5e3991c7123f9b0 completed April 18, 2026, 7:25 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0139f17a5481908896c1c6ff326c2f completed May 11, 2026, 2:07 a.m.
Created at: April 10, 2026, 5:33 a.m.