Triple

T17035860
Position Surface form Disambiguated ID Type / Status
Subject Kentucky Route Zero E413318 entity
Predicate finalActReleaseYear P15611 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [Kentucky Route Zero, finalActReleaseYear, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalActReleaseYear
Context triple: [Kentucky Route Zero, finalActReleaseYear, 2020]
  • A. finalReleaseYear chosen
    Indicates the calendar year in which something (such as a product, work, or version) is officially released for the last time.
  • B. finalAct
    Indicates that an action or event is the last or concluding act in a sequence or process.
  • C. finalEditionPublicationYear
    Indicates the year in which the final edition of a work was published.
  • D. finalVersionYear
    Indicates the year in which the final or last version of something was completed, released, or became definitive.
  • E. sequelReleaseYear
    Indicates the calendar year in which a sequel to an original work is released.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cd18288190b006abab23f811b7 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3d8f26f50819085dfd0fbecd6394d completed April 18, 2026, 7:18 p.m.
PD Predicate disambiguation batch_69e35d5be7f48190af9db67a1e23850f completed April 18, 2026, 10:30 a.m.
Created at: April 10, 2026, 5:33 a.m.