Triple
T17024810
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jackie Chan Stunt Team |
E413035
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | film production crew |
C22180
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: film production crew Context triple: [Jackie Chan Stunt Team, instanceOf, film production crew]
-
A.
production crew
chosen
A production crew is a coordinated team of behind-the-scenes professionals responsible for planning, organizing, and executing the technical and logistical aspects of a film, television, theater, or live event production.
-
B.
production credit
A production credit is an acknowledgment given in a film, television show, or other media project that identifies individuals or companies responsible for financing, managing, or overseeing the production.
-
C.
film and television production phase
A film and television production phase is a distinct stage in the creation process—such as development, pre-production, production, post-production, or distribution—during which specific tasks and workflows are carried out to move a project from concept to final release.
-
D.
film industry professional
A film industry professional is an individual who contributes specialized creative, technical, or managerial expertise to the development, production, or distribution of motion pictures.
-
E.
film professional
A film professional is an individual who contributes specialized creative, technical, or managerial expertise to the development, production, or distribution of motion pictures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886cc4170819093deddc7b8b4b6a7 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:33 a.m.