Triple

T17014707
Position Surface form Disambiguated ID Type / Status
Subject NAIT/Blatchford Market Station E412788 entity
Predicate instanceOf P0 FINISHED
Object light rail transit station C2851 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light rail transit station
Context triple: [NAIT/Blatchford Market Station, instanceOf, light rail transit station]
  • A. light-rail station chosen
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • B. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • C. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • D. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • E. light rail operations facility
    A light rail operations facility is a specialized complex where light rail vehicles are stored, maintained, dispatched, and managed to support safe and efficient transit service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cc4170819093deddc7b8b4b6a7 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:33 a.m.