Triple

T17005856
Position Surface form Disambiguated ID Type / Status
Subject CLASS Act E412567 entity
Predicate implementationHaltedDate P101820 FINISHED
Object 2011-10-14 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011-10-14 | Statement: [CLASS Act, implementationHaltedDate, 2011-10-14]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: implementationHaltedDate
Context triple: [CLASS Act, implementationHaltedDate, 2011-10-14]
  • A. halted
    Indicates that an ongoing process, action, or movement has been stopped or brought to an end.
  • B. stoppedAt
    Indicates that an entity has come to a halt or pause at a specific location or point in time.
  • C. cessationDate chosen
    Indicates the date on which an ongoing state, activity, or relationship comes to an end.
  • D. suspensionDate
    Indicates the date on which an entity’s normal status, operation, or privileges are formally suspended.
  • E. decommissioningStartDate
    Indicates the date on which the process of taking an asset or system out of active service is initiated.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886cb581c8190ab05f4b429c9cd85 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3d3831268819089286053a5acf653 completed April 18, 2026, 6:54 p.m.
PD Predicate disambiguation batch_69e35d552bc08190af17ef7659e094ef completed April 18, 2026, 10:30 a.m.
Created at: April 10, 2026, 5:32 a.m.