Triple

T16984521
Position Surface form Disambiguated ID Type / Status
Subject Richard M. Linnehan E412028 entity
Predicate participatedIn P149 FINISHED
Object STS-90 E177842 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-90 | Statement: [Richard M. Linnehan, participatedIn, STS-90]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-90
Context triple: [Richard M. Linnehan, participatedIn, STS-90]
  • A. STS-90 chosen
    STS-90 was a 1998 Space Shuttle Columbia mission focused on neuroscience research as part of NASA’s Neurolab program.
  • B. STS-99
    STS-99 was a Space Shuttle Endeavour mission in 2000 that conducted the Shuttle Radar Topography Mission to create a highly detailed 3D map of most of Earth’s land surface.
  • C. STS-95
    STS-95 was a 1998 Space Shuttle Discovery mission best known for carrying John Glenn back into space at age 77, making him the oldest person to fly in orbit.
  • D. STS-91
    STS-91 was a NASA Space Shuttle Discovery mission in 1998 that marked the final Shuttle docking with the Russian space station Mir and the last flight of the Spacehab module.
  • E. STS-97
    STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886ca8f348190812768ea8d5055ce completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3d18a0bf881908c449f499eb86495 completed April 18, 2026, 6:46 p.m.
NED1 Entity disambiguation (via context triple) batch_6a011b412dd48190862fde6d1656113d completed May 10, 2026, 11:56 p.m.
Created at: April 10, 2026, 5:32 a.m.