Triple
T16981285
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Irish Transverse Mercator |
E411950
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | national grid system |
C38350
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: national grid system Context triple: [Irish Transverse Mercator, instanceOf, national grid system]
-
A.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
C.
electricity interconnector
An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
national railway system
A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886ca8f348190812768ea8d5055ce |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:32 a.m.