Triple
T16977047
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | I-664 |
E411840
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | I-64 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-64 | Statement: [I-664, connectsTo, I-64]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: I-64 Context triple: [I-664, connectsTo, I-64]
-
A.
Interstate 64
chosen
Interstate 64 is a major east–west U.S. Interstate Highway running from Missouri to Virginia, connecting Midwestern cities to the Atlantic coast.
-
B.
Interstate 640
Interstate 640 is an auxiliary beltway of Interstate 40 that serves as a northern bypass around Knoxville, Tennessee.
-
C.
Interstate 68
Interstate 68 is an east–west U.S. highway running through northern West Virginia and western Maryland, providing a key Appalachian corridor connecting Morgantown to I-79 and I-70.
-
D.
Interstate 24
Interstate 24 is a major east–west U.S. highway running through the central United States, connecting cities in states such as Illinois, Kentucky, Tennessee, and Georgia.
-
E.
Interstate 664
Interstate 664 is a highway in southeastern Virginia that serves as the western segment of the Hampton Roads Beltway, connecting the cities of Hampton and Suffolk via a major bridge–tunnel crossing.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886ca8f348190812768ea8d5055ce |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3d184f2cc81908ac629c8f87696f8 |
completed | April 18, 2026, 6:46 p.m. |
Created at: April 10, 2026, 5:32 a.m.