Triple

T16963748
Position Surface form Disambiguated ID Type / Status
Subject Engineering Division (Hawaii DLNR) E411492 entity
Predicate instanceOf P0 FINISHED
Object public works engineering unit C4335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public works engineering unit
Context triple: [Engineering Division (Hawaii DLNR), instanceOf, public works engineering unit]
  • A. engineering division chosen
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • B. engineering institute
    An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
  • C. civil engineering support organization
    A civil engineering support organization is an entity that provides specialized technical, logistical, administrative, and project management services to assist civil engineers and infrastructure projects throughout their lifecycle.
  • D. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • E. public works ministry
    A public works ministry is a government department responsible for planning, developing, and maintaining public infrastructure and services such as roads, bridges, water systems, and public buildings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c9c9d481909afe222093641cae completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:31 a.m.