Triple

T16956091
Position Surface form Disambiguated ID Type / Status
Subject Wijkertunnel E411305 entity
Predicate relievesCongestionOn P32500 FINISHED
Object Velsertunnel E408915 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Velsertunnel | Statement: [Wijkertunnel, relievesCongestionOn, Velsertunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Velsertunnel
Context triple: [Wijkertunnel, relievesCongestionOn, Velsertunnel]
  • A. Velsertunnel chosen
    The Velsertunnel is a major road and rail tunnel in the Netherlands that runs beneath the North Sea Canal near Velsen, providing a key connection between the regions north and south of the canal.
  • B. Drontermeertunnel
    Drontermeertunnel is a railway tunnel in the Netherlands that carries the Hanzelijn line beneath the Drontermeer lake.
  • C. Beneluxtunnel
    The Beneluxtunnel is a major Dutch road and metro tunnel near Rotterdam that carries traffic beneath the Nieuwe Maas river, forming a key link in the region’s transport network.
  • D. Heinenoord Tunnel
    The Heinenoord Tunnel is a major Dutch road tunnel beneath the Oude Maas river that connects the island of Hoeksche Waard with the mainland near Rotterdam.
  • E. Euerwang Tunnel
    The Euerwang Tunnel is a major railway tunnel in Bavaria, Germany, forming a key part of the high-speed rail connection between Nuremberg and Ingolstadt.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c9c9d481909afe222093641cae completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3d01c7b408190b5a2b6c62b050b76 completed April 18, 2026, 6:40 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00d4666f14819095fc3bcf5e459b61 completed May 10, 2026, 6:54 p.m.
Created at: April 10, 2026, 5:31 a.m.