Triple
T16955123
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Église Saint-Jean-Bosco de Paris |
E411279
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 20th-century church building |
C20485
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 20th-century church building Context triple: [Église Saint-Jean-Bosco de Paris, instanceOf, 20th-century church building]
-
A.
contemporary church building
chosen
A contemporary church building is a modern place of Christian worship that integrates current architectural styles, materials, and technologies while accommodating liturgical functions and community activities.
-
B.
Reformed church building
A Reformed church building is a Christian worship structure designed and used by congregations within the Reformed (Calvinist) tradition, typically characterized by simple, unadorned architecture that emphasizes preaching and congregational gathering.
-
C.
Art Nouveau church
An Art Nouveau church is a religious building that combines traditional ecclesiastical forms with the flowing lines, organic motifs, and innovative materials characteristic of the Art Nouveau movement.
-
D.
Historic church
A historic church is a long-standing religious building of significant architectural, cultural, and spiritual importance that reflects the beliefs, artistry, and community life of its era.
-
E.
17th-century church
A 17th-century church is a religious building constructed in the 1600s that typically reflects Baroque or late Renaissance architectural styles, serving as a place of Christian worship and community gathering.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886c9c9d481909afe222093641cae |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:31 a.m.