Triple

T16951998
Position Surface form Disambiguated ID Type / Status
Subject Operation Number One E411201 entity
Predicate instanceOf P0 FINISHED
Object World War II military campaign plan C635 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II military campaign plan
Context triple: [Operation Number One, instanceOf, World War II military campaign plan]
  • A. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • B. World War II campaign chosen
    A World War II campaign is a coordinated series of military operations conducted over a specific period and geographic area, aimed at achieving strategic objectives within the broader context of the war.
  • C. Nazi military operation
    A Nazi military operation is a planned and coordinated action conducted by the armed forces of Nazi Germany to achieve specific strategic, tactical, or political objectives during its period of rule, particularly in World War II.
  • D. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • E. World War II Allied operation
    A World War II Allied operation is a coordinated military campaign or mission planned and executed by the Allied powers to achieve specific strategic, tactical, or logistical objectives against the Axis forces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c9c9d481909afe222093641cae completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:31 a.m.