Triple

T16947348
Position Surface form Disambiguated ID Type / Status
Subject Integrated Coastal Area Management E411100 entity
Predicate instanceOf P0 FINISHED
Object coastal management approach C38293 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal management approach
Context triple: [Integrated Coastal Area Management, instanceOf, coastal management approach]
  • A. coastal engagement
    Coastal engagement is the dynamic interaction between people and coastal environments through social, economic, cultural, and ecological activities that shape and are shaped by shoreline spaces.
  • B. coastal reservation
    A coastal reservation is a protected shoreline area designated to conserve marine and coastal ecosystems while allowing limited, sustainable human use and cultural activities.
  • C. coastal region
    A coastal region is a geographic area where land meets the ocean or sea, characterized by unique environmental, economic, and cultural features shaped by its proximity to the shoreline.
  • D. coastal settlement
    A coastal settlement is a community established along a sea or ocean shoreline, whose location, economy, and culture are strongly influenced by the adjacent marine environment.
  • E. coastal campus
    A coastal campus is an educational institution whose grounds are located adjacent to or near a coastline, integrating academic facilities with marine-influenced natural surroundings and resources.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c886688190967be07322597ac9 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:31 a.m.